Across its lifespan the project will progressively output a number of key deliverables in accordance with the projected timeframe as listed below [month M].
-(WP1-D1.1) Mid-term project report (UNISAN, M13)
-(WP1-D1.2) Final project report (UNISAN, M24)
-(WP1-D1.3) Mid-term dissemination and communication report (UNIGE, M13)
-(WP1-D1.4) Final dissemination and communication report (UNIGE, M24)
-(WP2-D2.1) Report on the formalization of the EC optimization problems: sizing and internal operations (UNISAN, M12)
-(WP2-D2.2) Report on the formalization of the multi-ECs optimization problem: external operations (UNIGE, M10)
-(WP3-D3.1) Toolboxes for sizing (UNISAN, M16)
-(WP3-D3.2) Algorithms and toolboxes for internal and external operations (UNIBO, M18)
-(WP4-D4.1) Simulated scenarios testing for large-scale application (UNIBO, M20)
-(WP4-D4.2) Savona campus for ECs toolboxes testing (UNIGE, M24)
-(WP4-D4.3) Roseto Valfortore sizing assessment (UNISAN, M24).