The major milestones to be achieved are as reported in the Project GANTT Chart - Fig. 7 below [year Y | month M]:

-M1 Preliminary models available (M4)
-M2 Final models available (M12)
-M3 Baseline from the EC in Roseto Valfortore (M18)
-M4 Algorithms for sizing and internal/external operations available (M18)
-M5 Toolboxes available (M20).




